MG-08 · Planning and development assessment

Is every application assessed against every clause, decided on time, by the right person?

Pathways from the scheme. Completeness once. Referrals in parallel. Notification honoured and every submission answered. Every clause cited in the report. Every determination a delegated planner's or the panel's. Certificates on evidence; enforcement after notice. Measures first.

Median determination

52 days

net of stopped clock; was 71 against a 40-day standard

Requests for information

0.00

per application, at most one; was 2.3

Clauses cited in reports

n/a

0 reports; was partial

Submissions answered

n/a

every issue, in the report

Statutory dates at risk

1

within 7 days, clock running

Awaiting a decision

0

held by guardrail

The scheme

Zones, their pathways and controls; overlays add referrals and documents

ZoneNameLotsUsesControls
B2Local centre2shop (code), cafe (code), office (code), shop top housing (merit), mixed use (merit)cl 4.3 Height of buildings ≤ 15m; cl 4.4 Floor space ratio ≤ 1.5:1; DCP 5.1 Active street frontage ≥ 0.7; DCP 5.4 Car parking (spaces per 100 m²) ≥ 1
IN1General industrial1warehouse (code), light industry (code), depot (merit)cl 4.3 Height of buildings ≤ 12m; DCP 7.2 Landscaped buffer to residential ≥ 10m
R2Low density residential3dwelling (code), dwelling alterations (code), secondary dwelling (code), home business (code), dual occupancy (merit)cl 4.3 Height of buildings ≤ 8.5m; cl 4.4 Floor space ratio ≤ 0.5:1; DCP 3.2 Front setback ≥ 6m; DCP 3.5 Site coverage ≤ 0.5; DCP 3.8 Landscaped area ≥ 0.3
RU1Primary production1farm building (exempt), dwelling (merit), rural industry (merit)cl 4.3 Height of buildings ≤ 10m; DCP 8.1 Setback from road ≥ 20m

Waiting on a person

Nothing held. Lodge and assess the applications, run certification, inspect complaints.

Activity, reported last

Applications open

6

8 on record

Determined

2

1 approved

Building works

3

0 complete

Complaints

2

2 to inspect

Evidence chain

Intact

5 events